Logistics Center & Assembly Hall | Gustavsberg, Sweden

Investing in the future of an old industrial town

Stockholm, Sweden, 2014 - 2015

Advantages of the new logistic center

Open in BuildingExperience

The project is located in Gustavsberg on the island of Värmdö around 30 km east of Stockholm. Villeroy & Boch invested around SEK 130 million into a new central warehouse and logistic center which was built by NCC Construction Sverige. The building will be used for assembly, quality control of bathroom porcelain and logistics. This marks a new epoch in Gustavsberg’s long history. After around 200 years, the Gustavsbergsfabriken left its original location and moved to an environmental profiled business park in Ekobacken which is right next to Gustavsberg. This enables the commune to develop a new neighborhood on the old fabric plot.

The new building has around 8,500 sq.m. The largest part is used for the warehouse with about 11,000 pallet spaces and logistics. The rest is used for assembly and quality control of toilets and sinks. Its energy consumption is around 58 kWh per sq.m. which is 28% less than the building norm demands.

Link: Villeroy & Boch Gustavsberg AB about the project (Swedish)

Department: Architecture
Field of Expertise:
Industry
Project status:
Completed
Building owner:
Villeroy & Boch Gustavsberg AB
Entrepreneur:
NCC Construction Sverige AB
Building size:
8 500 sq.m.
Construction costs:
130 000 000 SEK
Location:
Gustavsberg, Sweden
Project start:
2014/06
Project end:
2015